The primary purpose of works is is "Help to the population in the economy
of facilities on heating".
Example of warming
«Ice-age» «Ice-age
2»
Rope access, I'm in industrial rope access trade
An order acted on warming by the foam plastic of house " of
Stalin" times in the center of city Dniprodzerzhynsk. The construction of
house supposes many excisions of foam plastic and shallow work, all on walls is
caused to fall, in general continuous complications, but work is work. And
taking into account the small " squaring" of the surface warmed by a
foam plastic, basic support on quality of works and renewal of different
elements of construction that was ordered by a customer. By basis for
technology of warming of outwalls a foam plastic by a "wet method" -
clout mixtures, there is the special facade foam plastic(or cotton wool for
" the ventilated" systems of warming). This foam plastic is specially
used as утеплитель for works outside of building.
Facade foam plastic flags for the outward
warming of walls, standard a 0.5
m or 1м х 1м and their thickness have a size a 1 m of х sneaks up at drafting of estimate
on an object in accordance with the requirements of customer on warming of
building facade, at home or apartments(it is ordinary a 50 mm).
At gluing
of foam plastic flags on the facade of building, facade masters of Industrial
Mountaineering follow data of level plumbs and set foam plastic flags strictly
apeak on plumbs.
Industrial
Alpinist(steeplejack), edges a foam plastic the second side of flight. For
fastening of foam plastic on the outwall of house the special solution of glue
is used for gluing of пенополистирольных flags(foam plastic). For this purpose we use
glue of Ceresit СТ or ТМ Moment(for gluing of foam plastic)
depending on solvency and preferences of customer. Glue for a foam plastic
consists of the sown sand, cement and special mineral glue additions. Solution
for gluing of foam plastic is supplied in a dry kind and stirred with water
before the use to necessary consistency with the observance of recommendations
and proportion of producer.
Warming
"on a circle", a contour is edged, and offcutss for an economy to the
customer of залаживаются
on an internal perimeter. Prepared with a help electro- mixer solution for
gluing of foam plastic is inflicted evenly on foam plastic flags by means of toothed
spatula. At an even external wall, glue for a foam plastic is inflicted by the
special toothed spatula from 4мм. In another cases(as practice showed 99%%) glue for a foam plastic is
inflicted by spatulas with points 8 - 12 мм.
Prepared to поклейке a foam plastic flag registers by means of the inflicted glue for a
foam plastic on a wall and becomes level on a plumb and in relation to the
corners of construction. Further also other foam plastic flags are glued on an
external wall in relation to corners, joints, guy-sutures on a level plumb.
A foam
plastic is glued by mixture for gluing of пенополистирольных flags, here промазывается fully all surface of sheet of foam
plastic, all foam plastic flags are glued on an external wall in one plane and
what curves outwalls would not be initially, in the end the foam plastic
surface of the done plane from a foam plastic turns out very even "under a
level-plumb"
While glue
for gluing of foam plastic by means of that foam plastic flags are fastened to
the outwall, did not dry out, through foam plastic flags wimbled in a wall for
setting of fastening dowels. After drying out of glue boring for setting of
fastening dowels can injure dried-up glue as a result of vibration, nailing and
squeezing out of slag outside. We nail we produce at once - to "glue and
pin to the complete drying" out.The dowel specially worked out for fixing
of foam plastic is made out of plastic of certain long. In the middle of dowel
there is opening for the plastic nail supplied in a complete set with a dowel,
and a hat is done as " an umbrella"(dowel-nail for heat-insulation). A
plastic nail is inserted in a dowel(umbrella) that in turn cutting-in in the
drilled opening through a foam plastic in a wall and by means of hammer hides.
The hammered in an and a bit sunk in a foam plastic flag dowel is fixed into a
wall, расклинивает and eliminates possibility of his falling the same out of
outwall. Fastening method to "Glue and pin to the complete drying"
out of foam plastic flags give in the total maximally strong and at the same
time plastic connection with the external wall of building.At such roofing
timbers, loading does not threaten a foam plastic outwall from ordinary
deformations of building and even appearing cracks of outwalls and removing
layer by layer of areas of old plaster of building.
Apparently
on a photo, on the intermediate stage work on warming finds outlines a foam
plastic. In the process of fixing of foam plastic plastic dowels for
heat-insulation, treatment of all corners goes for giving them to evenness. Also
corners of foam plastic surface are on the defensive additionally. For this
purpose the special plastic corners are used with the net glued on them.
Industrial
Alpinist proceeds to plastering the first layer, набрызгом"(those. name) passes " -
by solution over plastic, trying to equalize a general surface, task on this
stage "pre-treatment of surface" for plastering by the second layer. Mixture
for re-enforcement of пенополистирольных flags(foam plastic) is inflicted by a layer an
about 3 mm
through a стекловолоконную reinforcing net on the external surface of foam plastic wall. Thus, the
layer of reinforcing composition turns out, on a foam plastic wall,
additionally reinforced стеклосеткой.
(in an
eventual variant on a foam plastic two layers of the reinforced mixture, not
glue, not universal glue are inflicted, namely to reinforcing mixture is
maximal durability by popular materials)
After
drying out of the reinforced layer on a foam plastic, the got surface
additionally will be becomes level by means of the second layer of армировоной mixture or decorative
plaster("bark beetle", " baa-lamb", "marble
crumb") by the method of puttying or torket of the reinforced mixture
under constraint by the special equipment.
During the
preliminary plastering of window slopes, cornices(by solution "under a
brush") are restored, the absent elements of construction are cut out from
a foam plastic glued, or restored " by modelling" with the subsequent
plastering.
The plaster
of foam plastic is executed through a net from a fiberglass, for giving of
durability and longevity coverage.
(a building
net is an element of additional armor, increasing durability "on the
break" of the clout-reinforced coverage due to durability of fibres of
fiberglass)
Surface of
the external wall edged by a foam plastic and армироанной dried out to the complete drying
out.
The even
turns out and strong 2th layer the reinforced layer, protecting a foam plastic
from the mechanical and atmospheric phenomena, and also being basis for causing
of the last finishing layer - painting. A drying out surface is grounded by
facade soil or грунт-краской, by a paint on acrylic basis and
dried out again.
As a result of the done work
from frozen solid обьекта with the raw corners, caused to
fall by cornices and window-sills
turned out
HEAT-INSULATED Object of MODERN DESIGN
Before warming:
After warming:
At
implementation of works there are very much technical receptions and nuances
that it is impossible to describe, but they must be necessarily executed. If
not to observe the tested technology, then it affects on quality and longevity
of the system. «Ice-age